|
Applications in Paper Industry
The removal of large build-ups can lead to shut downs for hours, even days,
costing your firm time and money. Using the ATD-Pressure Gas System, these long
expensive cool-down periods in the kiln can be avoided.
By properly installing the ATD-Pressure Gas Tube into ATD-Base Socket located
on the kiln shell, the tube blasts CO2 inside
destroying build-up, while leaving the brick lining intact.
Compared to the conventional method, the use of the ATD-System is quick
efficient and cost-saving. In six to eight hours, the ATD-System can remove a
buildup of 10 meters without even sending one man into the kiln.
|
| Hotline:
+49 231 967866 0
Notice to our worldwide
visitors: The ATD-Company-Office
can be reached during the
regular German office-hours:
Monday - Thursday from 9:00
am until 4:00 pm, Friday
from 9:00 am until 1:00
pm. Our actual local
time is:

|
|

ATD-Pressure-Gas-System-Cardox
Show animation
|
|
Your
personnel will be trained
and certified by ATD - technicans
in using the ATD - Pressure
Gas System - Cardox.

|
|